Mechanical
Function testing of field instruments
Hot oil flushing of instrument tubing
Area completion
- Visual inspection for complete and correct installation
- Internal inspection of tanks and vessels
- Alignment
- Load testing of lifting equipment
- Hot oil flushing
- Bolt tensioning
- Dimension control
- Preservation
Instrument/Telecommunication
- Calibration and testing of instruments prior to installation
- Visual inspection for complete and correct installation
- Insulation and continuity testing of cables
- Cleaning, flushing, pressure and leak te
sting of pneumatic and hydraulic tubing - Adjustment of control, alarm and shutdown settings
- Loop testing
- Function testing of control systems
The overall goal of Mechanical installations is to verify that the system is
designed and built to fulfil its purpose and specified requirements.
Mechanical activities include checking of fabrication and installation work in the following ways:
designed and built to fulfil its purpose and specified requirements.
Mechanical activities include checking of fabrication and installation work in the following ways:
- Visual inspection for complete and correct installation
- Internal inspection of tanks and vessels
- Alignment
- Load testing of lifting equipment
- Hot oil flushing
- Bolt tensioning
- Dimension control
- Preservation